
The Guardian, 19 March 1947
After a series of floods, Sir Murdoch MacDonald tried to resurrect Vermuyden’s scheme to drain the eastern tributaries of the Ouse around the South Level. After WWII and the 1947 floods, his firm was commissioned to design and supervise construction of the present channel, completed in 1968.